2021

  • Abdulhalim, I., González, V.A., Mutch, C., Amor, R. (2021). Improving Post-Earthquake Evacuation Preparedness for Deaf and Hard of Hearing Children: A Conceptual Framework. International Journal of Risk Reduction (accepted) [IF: 2.896, Q1].
    Abdelmegid, M.A., González, V.A., O’Sullivan, M., Walker, C. G., Poshdar, M. and Alarcón, L.F. (2021). Exploring the Links between Simulation Modelling and Construction Production Planning and Control: A Case Study on the Last Planner System, Production Planning and Control (accepted) [IF: 3.605, Q1].
  • Hassanpour, S., Rassafi, A. A., Gonzalez, V., Liu, J. (2021). A hierarchical agent-based approach to simulate a dynamic decision-making process of evacuees using reinforcement learning. Journal of Choice Modelling, Vol 39, 100288 [IF: 2.071, Q1].
    Feng, Z., González V. A., Mutch, C., Amor, R. and Cabrera, G. (2020). Instructional Mechanisms in Immersive Virtual Reality Serious Games: Earthquake Emergency Training for Children. Journal of Computer Assisted Learning, Vol 37, Issue 2, pp. 542-556 [IF: 2.126 , Q1].

2020

  • Abdelmegid, M., Gonzalez, V. A., O’Sullivan, M., Walker, C. G., Poshdar, M., and Ying., F. (2020). The Roles of Conceptual Modelling in Improving Construction Simulation Studies: A Comprehensive Review, Advanced Engineering Informatics, Vol. 46, 101175 [IF: 3.358, Q1].
  • Feng, Z., Gonzalez, V. A., Mutch, C., Amor, R., Rahouti, A., Baghouz, A., Li, N. and Cabrera-Guerrero, G. (2020). Towards a Customizable Immersive Virtual Reality Serious Game for Earthquake Emergency Training, Advanced Engineering Informatics, Vol 46, 101134 (October) [IF: 3.358, Q1].
  • Feng, Z., Gonzalez, V. A., Trotter, M. Spearpoint, M., Thomas, J., Ellis, D. and Lovreglio, R., (2020). How People Make Decisions During Earthquakes and Post-Earthquake Evacuation: Using Verbal Protocol Analysis in Immersive Virtual Reality, Safety Science, Vol 129, issue 2 [IF: 3.619, Q1].
  • Feng, Z., Gonzalez, V. A., Amor, R., Spearpoint, M., Thomas, J., Sacks, R., Lovreglio, R. and Cabrera-Guerrero, G. (2020). An Immersive Virtual Reality Serious Game to Enhance Earthquake Behavioral Responses and Post-earthquake Evacuation Preparedness in Buildings, Advanced Engineering Informatics, Vol 45, 101118 [IF: 3.358, Q1].
  • Abdelmegid, M., Gonzalez, V. A., Poshdar, M., O’Sullivan, M., Walker, C. G. and Ying., F. (2020). Barriers to Adopting Simulation Modelling in Construction Industry, Automation in Construction Vol 111, 103046 [IF: 4.313, Q1].
  • Gao Y., González V. A., and Yiu T. W. (2020). Exploring the Relationship between Construction Workers’ Personality Traits and Safety Behaviour. Journal of Construction Engineering and Management, ASCE, Vol 146, issue 3 [IF: 2.734, Q1].

2019

  • Gao Y., González V. A., and Yiu T. W. (2019). The Effectiveness of Traditional Tools and Computer-Aided Technologies for Health and Safety Training in the Construction Sector: A Systematic Review. Computers and Education, Vol 138, pp 101-115 [IF: 5.627 , Q1].

2018

  • Lovreglio, R., Gonzalez, V. A., Feng, Z., Amor, R., Spearpoint, M., Thomas, J., Trotter, M. and Sacks, R. (2018). Prototyping Virtual Reality Serious Games for Building Earthquake Preparedness: The Auckland City Hospital Case Study. Advanced Engineering Informatics, Vol. 38, pp. 670-682. [IF: 3.772, Q1].
  • Feng, Z., González V. A., Amor, R., Lovreglio, R., and Cabrera, G. (2018). Immersive Virtual Reality Serious Games for Evacuation Training and Research: A Systematic Literature Review. Computers and Education, Vol 127, pp 252-256 [IF: 5.627 , Q1].
  • Poshdar, M., González, V. A., Raftery, G., Orozco, F. A. and Cabrera, G.. (2018). A Multiobjective Probabilistic-Based Method to Determine Optimum Allocation of Time Buffer in Construction Schedules. Automation in Construction, Vol 92, pp 46-58 [IF: 4.313, Q1].

2017

  • Antunes, R., González, V. A., Walsh, K., Rojas, O., Sullivam, M. and Odeh, I. (2017). Benchmarking Project-Driven Production in Construction using Productivity Function: Capacity and Cycle Time. Journal of Construction Engineering and Management, ASCE, Vol 144, issue 3 [IF: 2.734, Q1].
  • Golzarpoor, H., González, V. A., O’Sullivan, M., Shahbazpour, M., Walker, C. G. and Poshdar, M. (2017). A Non-Queue-Based Paradigm in Discrete-Event-Simulation Modelling of Construction Operations. Simulation Modelling Practice and Theory, Vol 77, pp 49-67. [IF: 2.426, Q1].
  • Antunes, R., González, V. A., Walsh, K. and Rojas, O. (2017). Dynamics of Project-Driven Production Systems in Construction: Productivity Function. Journal of Computing in Civil Engineering, ASCE, Vol. 31, issue 5, 04017053 [IF: 2.554 , Q1].
    Golzarpoor, H., González, V. A., O’Sullivan M. and Shahbazpour, M. (2017). An Input-Output Simulation Model for Assessing Production and Environmental Waste in Construction. Journal of Cleaner Production, Vol. 143, pp. 1094 – 1104 [IF: 6.395, Q1].